Yes, it is now noticeably taller than the main stand whereas in the CGI it is shorter. Platform also seems to come back a lot closer to the Thistlebarrow Road houses than in the planning images.
Aren't all the roofs being replaced by the final stage though?
 
Dropped by for a quick check to see how things are progressing.
The NW Corner is now roofed and 95% clad.
As said above - 2 piling rigs are working at the South End. Apparently there are 180 piles going in according to one of the guys working with the rig.
The new turnstile block has the turnstiles in situ and all the electrics too / but they are currently being connected up etc.
The concrete plinth for the turnstile block has been ‘tidied up’ ready to be levelled up and tarmac laid.
The undercroft floor for the SE corner is being rolled flat ready to be topped with tar mac too.
 
Dropped by for a quick check to see how things are progressing.
The NW Corner is now roofed and 95% clad.
As said above - 2 piling rigs are working at the South End. Apparently there are 180 piles going in according to one of the guys working with the rig.
The new turnstile block has the turnstiles in situ and all the electrics too / but they are currently being connected up etc.
The concrete plinth for the turnstile block has been ‘tidied up’ ready to be levelled up and tarmac laid.
The undercroft floor for the SE corner is being rolled flat ready to be topped with tar mac too.
Good intel! 180 piles with two rigs - they’ll smash that in a couple of weeks. Get that drone in the sky!
 
What is happening to the old Training pitches...? They seem to be in very good condition so we're obviously caring for them... But who uses them?
 
Dropped by for a quick check to see how things are progressing.
The NW Corner is now roofed and 95% clad.
As said above - 2 piling rigs are working at the South End. Apparently there are 180 piles going in according to one of the guys working with the rig.
The new turnstile block has the turnstiles in situ and all the electrics too / but they are currently being connected up etc.
The concrete plinth for the turnstile block has been ‘tidied up’ ready to be levelled up and tarmac laid.
The undercroft floor for the SE corner is being rolled flat ready to be topped with tar mac too.
NW corner cant be too far off being
Looking back at the CGIs on the Stadium Structures site, I think this is probably a better representation of the height and layout of the as-built NW corner - as opposed to the CGIs in the planning app.
View attachment 22762
This looks the nuts
 
Thanks Rob, these updates are great.

I wonder if the builders have pet names for the two pilling rigs like Sharon & Tracey, or Ted & Phil.
I think we should name them after 2 members of this board - who do we think is a total bore ? I’ll go for a Brian - any other suggestions?
 

;