Dean Court Redevelopment

So with 3 weeks till our next home game what do our building experts on here (and many thanks for your interesting updates) expect to see happening, will there be anything visible like steelwork to my untrained eye ?
 
So with 3 weeks till our next home game what do our building experts on here (and many thanks for your interesting updates) expect to see happening, will there be anything visible like steelwork to my untrained eye ?
South stand foundations will be ongoing. There are four grid lines for the upper tier - they’re working on the 1st and part of the 2nd from what I could see peeping over the hoarding yesterday. Wouldn’t be surprised if they’ve got another 4-6 weeks on that. It’s too congested to consider staggering the start of the structure in my opinion.

Hopefully we see the NW floodlight installed. Not sure why that’s not in yet. Unless they need the lift shaft issue resolving first. Hiring those temp floodlights won’t be cheap.

Lots of snagging to do on the two constructed corners. Roof flashings ongoing last week.

They’ve got plenty to go at on the main stand facade when they want to - LED screens, rendering, finishing the cladding.
 
They are going to take the concrete part of the lift apart to straighten it up so they can fit the lift. Hopefully this will give you access to the platform
Christ if that’s true, that’s one big cock up. Trying to picture how much of the roof that affects. Probably more the roof sheeting than the actual structure. Every project has a problem child, sounds like ours has been the NW corner. So yeh, that’s why the floodlight hasn’t yet been installed then.
 
Christ if that’s true, that’s one big cock up. Trying to picture how much of the roof that affects. Probably more the roof sheeting than the actual structure. Every project has a problem child, sounds like ours has been the NW corner. So yeh, that’s why the floodlight hasn’t yet been installed then.
Don’t worry it can be sorted
 
So in due course how are they going to get that Jolly Green Giant of a big crane into position to lift the NE corner floodlight into position? I’m finding it very difficult to understand how they are going to build that corner.
 
These cranes actually looked a bit smaller than the ones I saw operating in the summer.

In any case, if you look at the bank behind the North stand, the boundaries of the Thistlebarrow Rd houses are quite a way back, disguised by a couple of metres of greenery. So maybe the plan is to remove the bushes, dig the bank out and build a retaining wall?
Obviously the residents won't be happy, but I guess they'll still be celebrating the possibility that the north stand extension could be cancelled....
 
So in due course how are they going to get that Jolly Green Giant of a big crane into position to lift the NE corner floodlight into position? I’m finding it very difficult to understand how they are going to build that corner.
For the construction of the corner, the more I look at it, the more I think they may opt for a crawler crane. Given the weight and height of the lifts we’re talking about, something along the lines of this:

https://www.agd-equipment.co.uk/images/pdf/AGD_-_Sennebogen_653_-_Specification_1.pdf

The machine can slim down to just a couple of metres wide when travelling, making it relatively easy to manoeuvre into position. It would also have a smaller footprint than a comparable mobile crane when lifting.

The strategy for the NW and SE corner was a larger crane from one setup position and reach into the entire structure from one angle. I don’t think they’ll have that luxury for the NE corner (unless they go pitch side or possibly use a self erecting tower crane but I think that would be less favourable). A crawler crane might be the best option - gives them the flexibility to shimmy around the area and build it up from a few positions. They’ve probably got a few different options up their sleeve to be fair.

I wonder if they’ll need to do some temp works to remove the back span of the end bay of the existing north stand roof. It’s another constraint for the crane to work around. Having seen the clever remedial they did on the existing south stand, I’m sure that’s possible.

Less sure on the floodlight. That’s more about having a crane with that sort of height, which you only really get from a mobile crane or self erecting tower crane.
 
Last stadium pics before Prague!

Lots of progress on the South Stand - They may be doing a whole lot of concrete pouring as soon as next week.

North West floodlights lifted in but after a couple of tries the wind was too strong to safely finish it. Should happen as soon as tomorrow- if the wind drops of course.

 
Last stadium pics before Prague!

Lots of progress on the South Stand - They may be doing a whole lot of concrete pouring as soon as next week.

North West floodlights lifted in but after a couple of tries the wind was too strong to safely finish it. Should happen as soon as tomorrow- if the wind drops of course.

Thanks Rob - I didn’t realise the floodlights were a two crane job. That makes the NE corner even more fun! Safe travels - hopefully bump into you at some point.
 
I dropped by this lunchtime and the floodlight is complete, more good progress at the SS. There’s a lot of ‘light steel’in the compound - I’m really not sure what it’s for at this stage - unless it’s to do more reinforcement in the Mac Shack. It strikes me that if the Stand meets EUFA standards already - then why replace it ? Enlarge it and reprofiled to fit with the new rear part could be a good money saving.
 

;